Shovel-Truck Dispatch & Match Factor Simulator
Cycle equilibrium math & stochastic queuing simulation to balance fleets, eliminate shovel hang time, and cut truck bunching.
FLEET PRESET:
■ Surface Mine Haul Ramp Profile & Geotechnical Bench CAD
Active Circuit: Bench -120m RL ➔ Surface ROM Crusher
DT-03
HAULING UP RAMP (8.5%)
SPEED
24.2 km/h
PAYLOAD
228.4 t
FUEL RATE
194 L/h
Active Hauler Telemetry Matrix (Click truck to inspect) 12 Active
Fleet Allocation Controls
Active Haul Trucks 12 Trucks
Main Ramp Gradient 8.5% Grade
Active Shovels / Excavators 2 Shovels
Rated Payload (t)
Passes to Fill Truck
Shovel Pass Cycle (sec)
Cycle Component Times (min)
Spot at Shovel
Loaded Haul
Spot at Dump
Dumping Time
Empty Return Haul
Match Factor (MF)
1.12 Over-trucked
Ideal: 10.7 trucks
Hourly Throughput
2,380 t/h
28,560 t / 12h shift
Shovel Hang Time
95.2%
Truck Util: 89.1%
Avg Queue Delay
1.6 min
380 L idle diesel/shift
Cumulative Shift Production Tonnes
Stochastic Shovel Queue Delay Min / Trip
Cycle Time Component Decomposition
Component Pure Load Duration Shovel Cycle (Truck Exch.) Full Truck Cycle Limiting Bottleneck
Duration 2.13 min 2.73 min 12.73 min Shovel Constrained